| A Comparative Study of Conventional Effort Estimation and Fuzzy Effort Estimation Based on Triangular Fuzzy Numbers
|
|
Full
text: |
PDF(124.1KB) |
|
|
Source |
International Journal of Computer Science and Security (IJCSS) |
|
Table of Contents |
|
|
Download
Complete Issue PDF(1.01MB) |
|
Volume: 1 Issue: 4 |
| |
Pages: 1-47 |
|
Publication
Date: December 2007 |
|
ISSN
(Online): 1985-1553 |
|
|
|
|
|
Pages |
36 - 47 |
|
Author(s) |
|
|
|
Published
Date |
30-12-2008 |
|
Publisher |
CSC
Journals, Kuala Lumpur,
Malaysia |
|
ADDITIONAL
INFORMATION |
| Keywords Abstract References Cited by Related Articles Collaborative
Colleague |
| |
|
| |
KEYWORDS: FP, FFP, FPA, FFPA, LOC, Fuzzy logic |
|
|
| |
|
|
| This Manuscript is indexed in the following databases/websites:- |
|
| 1. Directory of Open Access Journals (DOAJ) |
| 2. CiteSeerX |
| 3. Docstoc |
| 4. Scribd |
| 5. PDFCAST |
| 6. ScientificCommons |
| 7. WorldCat |
| 8. Google Scholar |
| 9. Academic Index |
| 10. refSeek |
| 11. ResearchGATE |
| 12. Bielefeld Academic Search Engine (BASE) |
| 13. iSEEK |
| 14. Microsoft Academic Search |
| 15. Academic Journals Database |
| 16. Libsearch |
| 17. slideshare |
| 18. Socol@r |
| |
|
| |
|
|
| Effective cost estimation is the most challenging activity in software development.
Software cost estimation is not an exact science. However it can be transformed from a
black art to a series of systematic steps that provide estimate with acceptable risk.
Effort is a function of size. For estimating effort first we face sizing problem. In direct
approach size is measured in lines of code (LOC). In indirect approach, size is
represented as function points (FP). In this paper we use indirect approach. Fuzzy logic
is used to find fuzzy functional points and then the result is defuzzified to get the
functional points and hence the size estimation in person hours. Triangular fuzzy
numbers are used to represent the linguistic terms in Function Point Analysis (FPA)
complexity matrixes We can optimise the results for any application by varying the
fuzziness of the triangular fuzzy numbers. |
| |
|
| |
|
| |
| 1 |
Alaa F. Sheta, “Estimation of the COCOMO Model Parameters Using Genetic Algorithms for NASA Software Projects”. Journal of Computer Science 2(2):118-123, 2006. |
|
|
| 2 |
Bailey, J.W. and Basili, “A Meta model for software development resource expenditure”. Proc. Intl. Conf. Software Engineering, pp: 107-115, 1981. |
|
|
| 3 |
Boehm, B., “Software Engineering Economics”, Englewood Cliffs, NJ. Prentice-Hall, (1981). |
|
|
| 4 |
L.A. ZADEH., “From Computing with numbers to computing with words-from manipulation of measurements to manipulation of perceptions”, Int. J. Appl. Math. Computer Sci., Vol.12, No.3, 307- 324., 2002. |
|
|
| 5 |
L.A. ZADEH, “Fuzzy Sets, Information and Control”, 8, 338-353, 1965. |
|
|
| 6 |
Roger S. Pressman, “Software Engineering; A Practitioner Approach”, Mc Graw-Hill International Edition, Sixth Edition (2005). |
|
|
| 7 |
Ali Idri , Alain Abran and Laila Kjiri, “COCOMO cost model using Fuzzy Logic”, 7th International Conference on Fuzzy Theory & Technology Atlantic, New Jersy, 2000. |
|
|
| 8 |
Emilia Mendes, Nile Mosley, “Web Cost Estimation: An Introduction, Web engineering: principles and techniques”, Ch 8, 2005. |
|
|
| 9 |
J.E. Matson, B.E. Barrett, J.M. Mellichamp, “Software Development Cost Estimation Using Function Points”, IEEE Trans. on Software Engineering, 20, 4, 275-287, 1994. |
|
|
| 10 |
Harish Mittal, Pradeep Bhatia, “Optimization Criterion for Effort Estimation using Fuzzy Technique”. CLEI Electronic Journal, Vol. 10 Num. 1 Pap. 2, 2007. |
|
|
| 11 |
Musílek, P., Pedrycz, W., Succi, G., & Reformat, M., “Software Cost Estimation with Fuzzy Models”. ACM SIGAPP Applied Computing Review, 8(2), 24-29, 2000. |
|
|
| 12 |
W.Pedrycz, J.F.Peters, S. Ramanna, “A Fuzzy Set Approach to Cost Estimation of Software Projects”, Proceedings of the 1999 IEEE Canadian Conference on Electrical and Computer Engineering Shaw Conference Center, Edmonton Alberta, Canada, 1999. |
|
|
| 13 |
A. J. Albrecht, “Measuring application development productivity”, SHARE/GUIDE IBM Application development Symposium. |
|
|
| 14 |
V. R. Basili, K. Freburger, “Programming Measurement and Estimation in the Software Engineering Laboratory”, Journal of System and Software, 2, 47-57, 1981. |
|
|
| 15 |
B. W. Boehm et al., “Software Cost Estimation with COCOMO II”, Prentice Hall, (2000). |
|
|
| 16 |
Lima O.S.J., Farias, P.P.M. Farias and Belchor, A.D., “A Fuzzy Model for Function Point Analysis to Development and Enhancement Project Assessments”, CLEI EJ 5 (2), 2002. |
|
|
| 17 |
Jones, C., 1996, “Programming Languages Table”, Release 8.2, March |
|
|
| 18 |
Chuk Yau, Raymond H.L. Tsoi, “Assessing the Fuzziness of General System Characteristics in Estimating Software Size”, IEEE, 189-193, 1994. |
|
|
| |
|
| |
|
| |
| 1 |
H. Mittal, P. Bhatia, P. Goswami. "Software Quality Assessment Based on Fuzzy Logic Technique". International Journal of Soft Computing Applications,(3):105-112, 2008 |
|
|
| 2 |
S. Aljahdali and A.F. Sheta, “Software Effort Estimation by Tuning COOCMO Model Parameters Using Differential Evolution” Presented at Computer Systems and Applications (AICCSA), 2010 IEEE/ACS International Conference , Hammamet, (16-19 May 2010. |
|
|
| 3 |
Sultan Aljahdali, “Development of a Software Effort Estimation Model Using Differential Evolution”, Journal Of Electronics And Computer Systems (IJECS). 12(1), pp. 1-8, 2012. |
|
|
| |
|
| |
|
| |
| 1 |
Faculty of Vaish College of Engineering |
| 2 |
yasni |
| 3 |
biblioteca universia de recursos |
| |
|
| |
|
| |
|
| Harish Mittal : Colleagues
|
|
| Pradeep Bhatia : Colleagues
|
|