| Hybrid Genetic Algorithm for Multicriteria Scheduling with Sequence Dependent Set up Time
|
|
Full
text: |
PDF(144.1KB) |
|
|
Source |
International Journal of Engineering (IJE) |
|
Table of Contents |
|
|
Download
Complete Issue PDF(2.82MB) |
|
Volume: 3 Issue: 5 |
| |
Pages: 413-520 |
|
Publication
Date: November 2009 |
|
ISSN
(Online): 1985-2312 |
|
|
|
|
|
Pages |
510 - 520 |
|
Author(s) |
|
|
|
Published
Date |
30-11-2009 |
|
Publisher |
CSC
Journals, Kuala Lumpur,
Malaysia |
|
ADDITIONAL
INFORMATION |
| Keywords Abstract References Cited by Related Articles Collaborative
Colleague |
| |
|
| |
KEYWORDS: UWB, Indoor wireless systems, Keil IDE |
|
|
| |
|
|
| This Manuscript is indexed in the following databases/websites:- |
|
| 1. Directory of Open Access Journals (DOAJ) |
| 2. Academic Journals Database |
| 3. Docstoc |
| 4. Scribd |
| 5. PDFCAST |
| 6. WorldCat |
| 7. CiteSeerX |
| 8. Google Scholar |
| 9. ScientificCommons |
| 10. Academic Index |
| 11. ResearchGATE |
| 12. Bielefeld Academic Search Engine (BASE) |
| 13. Libsearch |
| 14. slideshare |
| 15. Chinese Directory Of Open Access |
| |
|
| |
|
|
| In this work, multicriteria decision making objective for flow shop scheduling with sequence dependent set up time and due dates have been developed. Multicriteria decision making objective includes total tardiness , total earliness and makespan simultaneously which is very effective decision making for scheduling jobs in modern manufacturing environment. As problem of flow shop scheduling is NP hard and to solve this in a reasonable time, four Special heuristics (SH) based Hybrid Genetic Algorithm (HGA) have also been developed for proposed multicriteria objective function. A computational analysis upto 200 jobs and 20 machines problems has been conducted to evaluate the performance of four HGA’s. The analysis showed the superiority of SH1 based HGA for small size and SH3 based HGA for large size problem for multicriteria flow shop scheduling with sequence dependent set up time and due dates.
Keywords: Flow shop scheduling, Genetic algorithm, Sequence dependent set up time, Total tardiness, Total earliness, makespan |
| |
|
| |
|
| |
| 1 |
Allahverdi A., Ng C.T., Cheng T.C.E. and Kovalyov M.Y. “A survey of scheduling problems with setup times or costs”. European Journal of Operation Research, 187(3):985–1032,2008 |
|
|
| 2 |
Rajendran C. “Theory and methodology heuristics for scheduling in flow shop with multiple objectives” .European Journal of Operation Research , 82 (3):540 ?555,1995 |
|
|
| 3 |
Ravindran D., Noorul Haq A., Selvakuar S.J. and Sivaraman R. “ Flow shop scheduling with multiple objective of minimizing makespan and total flow time”. International Journal of Advanced Manufacturing Technology, 25:1007–1012,2005 |
|
|
| 4 |
Gupta J.N.D., Venkata G., Neppalli R. and Werner F. “Minimizing total flow time in a two-machine flowshop problem with minimum makespan”. International Journal of Production Economics, 69:323–338,2001 |
|
|
| 5 |
Sayin S. and Karabati S. “A bicriteria approach to the two-machine flow shop scheduling problem”. European Journal of Operation Research, 113:435–449,1999 |
|
|
| 6 |
Danneberg D., Tautenhahn T., Werner F. “A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size”. Mathematical and Computer Modelling, 29 (9):101–126,1999 |
|
|
| 7 |
Toktas B., Azizoglu M. and Koksalan S.K. “Two-machine flow shop scheduling with two criteria: Maximum earliness and makespan”. European Journal of Operation Research, 157(2): 286–295,2004 |
|
|
| 8 |
Ponnambalam S. G., Jagannathan H., Kataria M. and Gadicherla A. “A TSP-GA multi-objective algorithm for flow shop scheduling”. International Journal of Advanced Manufacturing Technology, 23: 909–915,2004 |
|
|
| 9 |
Loukil T., Teghem J. and Tuyttens D. “Solving multi-objective production scheduling problems using metaheuristics”. European Journal of Operation Research , 161(1) :42–61,2005 |
|
|
| 10 |
Fred Choobineh F., Mohebbi E. and Khoo, H. “A multi-objective tabu search for a single-machine scheduling problem with sequence dependent setup times”. European Journal of Operational Research, 175, 318–337,2006 |
|
|
| 11 |
Rahimi Vahed R and Mirghorbani S. M. “A multi-objective particle swarm for a flow shop scheduling problem”. Combinatorial Optimization, 13 (1):79–102,2007 |
|
|
| 12 |
Noorul Haq and Radha Ramanan T. “A bicriterian flow shops scheduling using artificial neural network”. International Journal of Advanced Manufacturing Technology, 30: 1132–1138, 2006 |
|
|
| 13 |
Lockett A. G. and Muhlemann A. P. “Technical notes: a scheduling problem involving sequence dependent changeover times”.Operation Research, 20: 895-902,1972 |
|
|
| 14 |
Gowrisankar K, Chandrasekharan Rajendran and Srinivasan G. “Flow shop scheduling algorithm for minimizing the completion time variance and the sum of squares of completion time deviations from a common due date”. European Journal of Operation Research, 132:643–665,2001 |
|
|
| 15 |
Blazewicz J, Pesch E, Sterna M and Werner F. “ A comparison of solution procedures for two-machine flow shop scheduling with late work criterion”. Computers and Industrial Engineering, 49:611–624,2005 |
|
|
| 16 |
Eren, T. “A bicriteria m-machine flow shop scheduling with sequence-dependent setup times”. Applied Mathematical Modelling,2009 (In press), doi: 10.1016/j.apm.2009.04.005 |
|
|
| 17 |
Erenay F.S., et al. “New solution methods for single machine bicriteria Scheduling problem: Minimization of average flow time and number of tardy jobs”. European Journal of Operational Research,2009 (In press), doi:10.1016/j.ejor.2009.02.014 |
|
|
| 18 |
Naderi B., Zandieh M. and Roshanaei V. “Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness”. International Journal of Advanced Manufacturing Technology, 41:1186–1198,2009 |
|
|
| 19 |
Nawaz M., Enscore E. and Ham I. “Heuristic Algorithm for the M-Machine N-Job Flow Shop Sequencing Problem”. Omega, 11: 91–95,1983 |
|
|
| 20 |
Taillard E. “Benchmarks of basic scheduling problems”. European Journal of Operation Research, 64:278–285, 1993 |
|
|
| |
|
| |
|
| |
| 1 |
A. Dhingra and P. Chandna, “A bi-criteria M-machine SDST flow shop scheduling using modified heuristic genetic algorithm”, International Journal of Engineering, Science and Technology, 2(5), pp. 216-225, 2010. |
|
|
| 2 |
S. Najafi, V. M. Dalfard and G. Mohammadi, “Hybrid genetic algorithm for network locating problem by considering multi-purpose trip in stochastic state”, Indian Journal of Science and Technology , 4(9), pp. 1109-1112, Sep. 2011. |
|
|
| 3 |
F. Werner, “Genetic Algorithms for Shop Scheduling Problems: A Survey”, Chapter 1, pp. 1-12. |
|
|
| 4 |
K. M. Senthilkuma, V. Selladurai, K. Raja and V. Thirunavukkarasu, “A Hybrid Algorithm Based on PSO and ACO Approach for Solving Combinatorial Fuzzy Unrelated Parallel Machine Scheduling Problem”, European Journal of Scientific Research, 64(2), pp. 293-313, 2011. |
|
|
| 5 |
V. M. Dalfard, M. Ahmadpour, O. Jalilian and H. Jalilian, “Optimization of net present value of total net profits of client and contractor in payments of client to contactor by the use of hybrid genetic algorithm”, African Journal of Business Management, 6(5), pp. 2034-2042, Feb. 2012. |
|
|
| 6 |
P. Arikaran , Dr. V. Jayabalan and R. Senthilkumar, “Analysis of Unequal Areas Facility Layout Problems”, International Journal of Engineering (IJE), 4(1), pp. 44 – 51, Mar. 2010. |
|
|
| |
|
| |
|
| |
| 1 |
docin |
| 2 |
yasni |
| 3 |
pipl |
| |
|
| |
|
| |
|
| Ashwani Dhingra : Colleagues
|
|
| Pankaj Chandna : Colleagues
|
|