Probabilistic Analysis of a Desalination Plant with Major and Minor Failures and Shutdown During Winter Season
Padmavathi N, S. M. Rizwan, Anita Pal, Gulshan Taneja
Pages - 15 - 23     |    Revised - 20-01-2014     |    Published - 11-02-2014
Volume - 5   Issue - 1    |    Publication Date - January / February 2014  Table of Contents
MORE INFORMATION
KEYWORDS
Desalination Plant, Minor/Major Failures, Repairs, Semi – Markov, Regenerative Process.
ABSTRACT
In many desalination plants, multi stage flash desalination process is normally used for sea water purification. The probabilistic analysis and profitability of such a complex system with standby support mechanism is of great importance to avoid huge loses. Thus, the aim of this paper is to present a probabilistic analysis of evaporators of a desalination plant with major and minor failure categories and estimating various reliability indicators. The desalination plant operates round the clock and during the normal operation; six of the seven evaporators are in operation for water production while one evaporator is always under scheduled maintenance and used as standby. The complete plant is shut down for about one month during winter season for annual maintenance. The water supply during shutdown period is maintained through ground water and storage system. Any major failure or annual maintenance brings the evaporator/plant to a complete halt and appropriate repair or maintenance is undertaken. Measures of plant effectiveness such as mean time to system failure, availability, expected busy period for maintenance, expected busy period for repair, expected busy period during shutdown & expected number of repairs are obtained by using semi-Markov processes and regenerative point techniques. Profit incurred to the system is also evaluated. Seven years real data from a desalination plant are used in this analysis.
CITED BY (1)  
1 Rizwan, S. M., Padmavathi, N., & Taneja, G. (2015). Performance analysis of a desalination plant as a single unit with mandatory shutdown during winter. Arya Bhatta Journal of Mathematics and Informatics, 7(1), 195-202.
1 Google Scholar 
2 CiteSeerX 
3 refSeek 
4 Scribd 
5 SlideShare 
6 PdfSR 
A G Mathew, S M Rizwan, M C Majumder, K P Ramachandran and G Taneja, Reliability analysis of an identical two-unit parallel CC plant system operative with full installed capacity,International Journal of Performability Engineering, Vol. 7(2), pp. 179-185, 2011.
B Parashar and GTaneja, Reliability and profit evaluation of a PLC hot standby system based on a master-slave concept and two types of repair facilities. IEEE Transactions on reliability,Vol. 56(3), pp. 534-539, 2007.
N Padmavathi, S M Rizwan, A Pal and G Taneja, “Reliability Analysis of an evaporator of a Desalination Plant with online repair and emergency shutdowns”, Aryabhatta Journal of Mathematics & Informatics, Vol. 4(1), pp. 1-12, Jan. – June 2012.
N Padmavathi, S M Rizwan, A Pal, G Taneja, “Probabilistic analysis of an evaporator of a desalination plant with priority for repair over maintenance, International Journal of Scientific and Statistical Computing, Vol. 4 (1), pp.1-9, Feb. 2013.
S M Rizwan, N Padmavathi and G Taneja, “Probabilistic Analysis of an Evaporator of a Desalination Plant with Inspection”, i-manager’s Journal on Mathematics, Vol. 2, (1), pp. 27 –34, Jan.- Mar. 2013.
S M Rizwan, N Padmavathi, A Pal, G Taneja, “Reliability analysis of seven unit desalination plant with shutdown during winter season and repair/maintenance on FCFS basis”,International Journal of Performability Engineering, Vol. 9 (5), pp. 523-528, Sep. 2013.
Miss Padmavathi N
caledonian College of engineering - Oman
padma@caledonian.edu.om
Professor S. M. Rizwan
caledonian College of engineering - Oman
Dr. Anita Pal
Department of Mathematics National Institute of Technology Durgapur, India - India
Professor Gulshan Taneja
MD UNIVERSITY - India


CREATE AUTHOR ACCOUNT
 
LAUNCH YOUR SPECIAL ISSUE
View all special issues >>
 
PUBLICATION VIDEOS